Shanghai Tower
References
Research Paper:
Building-Also, O. S. T. G. (2009). on Application of Green Building Standards to Shanghai Center Tower and Related Technical Strategies [J]. Building Construction, 10.
Chen, J.L., Zhang, D.S. (2012). BIM in Shanghai Center Tower. Building Structure, 42(3), 10013-10015.
Ding, J. M. (2012). Architectural and Structural Design of Shanghai Tower.Architecture Technique, 5, 94-99.
DING, J., CHAO, S., ZHAO, X., & WU, H. (2010). 1, 2 (1. Architectural Design & Research Institute of Tongji University (Group) Co. Ltd, Shanghai 200092, China; 2. Building Engineering Department, Tongji University, Shanghai 200092, China); Critical issues of structural analysis for the Shanghai Center project [J]. Journal of Building Structures, 6.
Ge, Q. (2012). Research on lean management by BIM technology in Shanghai Tower.
Hien, W. N., Lam, K. P. & Feriadi, H. (2000). The use of performance-based simulation tools for building design and evaluation—a Singapore perspective. Building and Environment, 35(8), 709-736.
Jiemin, D., Jiupeng, L., Zhijun, H., & Yin, H. (2013). Construction Simulation Analysis for Hanging Curtain Wall Support Structure of Shanghai Tower. Construction Technology, 8, 033.
Jiemin, D., & Zhijun, H. (2013). Analysis and design of flexible hanging curtain wall support structure system of Shanghai Tower. Building Structure,9, 003.
LIANG, P., & DING, Y. (2012). Shanghai Climate Center, Shanghai 200030 2 National Climate Center, Beijing 100081; Extended Range Forecast Experiment Based on Intraseasonal Oscillation [J]. Chinese Journal of Atmospheric Sciences, 1.
Loftness†, V., Lam, K. P., & Hartkopf, V. (2005). Education and environmental performance-based design: a Carnegie Mellon perspective. Building Research & Information, 33(2), 196-203.
Lam, K. P., & Yeang, K. (2009). Computational building performance modelling and ecodesign. Architectural Design, 79(5), 126-129.
Michael, P. E. N. G. (2012). Digital Design and Construction of Shanghai Tower. Time Architecture, 5, 018.
Peng, Z., & Donghai, H. (2013). Application of the Building Information Modeling Technology in Curtain Wall Buildings [J]. Construction Technology, 8, 036.
Poon, D. C., Hsiao, L. E., Zhu, Y., Zuo, S., & Fu, G. (2010). Structural analysis and design challenges of the shanghai center. In Structures Congress 2010 (pp. 3088-3103). ASCE.
Su, J. Z., Xia, Y., Chen, L., Zhao, X., Zhang, Q. L., Xu, Y. L., ... & Chen, A. R. (2013). Long-term structural performance monitoring system for the Shanghai Tower. Journal
of civil structural health monitoring, 3(1), 49-61.
Wang, G. RESEARCH ON THE IMPACT OF BIM MATURITY ON THE SUSTAINABILITY OF PROJECT ORGANIZATION BASED ON SOCIAL NETWORK ANALYSIS.
Wensheng, L. S. L., & Baofeng, H. U. A. N. G. (2013). Analysis and Verification of Seismic Responses of Hanging Glass Curtain Walls of a High-rise Building. Structural Engineers, 1, 013.
Wang, Y., Wu, H.B. (2009). The numerical simulation of the atrium environment in Shanghai Tower. The 2009 CDAJ-China user conference papers.
Xia, J., Poon, D., & Mass, D. (2010). Case study: Shanghai Tower. CTBUH Journal, 12-18.
Yin, H. U., & Jiemin, H. Z. D. (2011). Selection of Curtain Wall Support Structures of Shanghai Tower [J]. Structural Engineers, 5, 002.
ZELJIC, A. S. (2010). Shanghai Tower Façade Design Process. InInternational Conference of Building Envelope Systems.
(Retrieved from: http://www. gensler.com/uploads/documents/Shanghai_Tower_Faca de_Design_Process_11_10_2011. pdf.)
Zhang, Q., Yang, B., Liu, T., Li, H., & Lv, J. Structural Health Monitoring of Shanghai Tower Considering Time-dependent Effects.
Zhaoa, X., Ding, J. M., & Suna, H. H. (2011). Structural design of shanghai tower for wind loads. Procedia Engineering, 14, 1759-1767.
ZHAO, X., DING, J., SUN, H., & CHAO, S. (2011). Co., Ltd, Shanghai 200092, China); Structural design of the Shanghai Tower for wind loads [J]. Journal of Building Structures, 7.
Other Source:
The Skyscraper Center on April 08, 2015 at 02:47 AM Central For the most up to date version. ( http://skyscrapercenter.com)
Introduction of Mech & Elec System in Shanghai Tower (PPT document supplied by - Shanghai installation engineering Co., Ltd)
Video Resource:
1.Shanghai Tower Construction update with its Chief Architect Marshall Strabala ( http://youtu.be/MUn5iHAxkes)
2.Shanghai Tower ( https://www.youtube.com/watch?v=yCbLNu6hzxI)
3. The role of BIM in Shanghai Tower ( https://www.youtube.com/watch?v=Cp7_AgY2HJs&sns=fb)